The main park has a capacity of 200 MW when Sandrini II provides a capacity of 100 MW. The full price of both of those jobs weren't disclosed however, through building, over 200 workers had been used. The tasks are envisioned to check out a handful of positions opening up https://californiasolarservices.water.blog/2024/09/13/4-tips-to-hire-the-best-commercial-solar-contractors/