Smoke leakage (S): Failure of this criterion shall have transpired In case the stream price in duct A over the exam exceeds ten m³ / (m² h), relevant to 20 °C and 1013 mbar, linked to the internal surface area place in the duct inside the furnace. Phenol Novolac Epoxies https://caswell-group79011.full-design.com/not-known-facts-about-fire-resistant-ductworth-isntallers-78724658